/
Managing work log [3.5.x]
Managing work log [3.5.x]
Logging your work from MS Excel
In order to add work log to your issue you need to select one of the cells in the row that contains the issue (1) and click button Add (2). A dialog will appear (3) that allows you to type in information regarding the work log. The dialog resembles dialog found in Jira, so it stays intuitive and ease to use.
Viewing worklogs
In order to check worklogs reported on an issue, select one of the cells in the row that contains the issue (1) and click button View (2). Dialog will appear showing list of all worklogs on the issue (3).
Related content
Modifying and creating issues [3.5.x]
Modifying and creating issues [3.5.x]
Read with this
Excel Connector for JIRA [3.5.x]
Excel Connector for JIRA [3.5.x]
Read with this
Accessed Issue Tab Mode [3.5.x]
Accessed Issue Tab Mode [3.5.x]
Read with this
User roles and permissions in Jira and its representation in Excel Connector [3.5.x]
User roles and permissions in Jira and its representation in Excel Connector [3.5.x]
Read with this
Getting started
Getting started
Read with this
Feel free to tell us what topic should be covered: excelconnector@psc-software.atlassian.net